Example legionella risk assessment report
A look inside, page by page
Eight of the 46 pages, with what each one is for. The building is made up. The layout and the level of detail are the real thing.

Page 1 of 8
The cover
Your building, the date of the survey and the date the assessment should next be reviewed. In the example the building is made up, and every page says so.

Page 2 of 8
One overall risk rating
The page most people read first. One rating for the whole building (Moderate, in the example), then the reasons in plain words. The score table shows where the building is now and where it will be once the work is done.

Page 3 of 8
What to fix, in order
Every finding says where it is, why it matters and what to do about it, with a photograph. Findings are sorted into high, medium and low priority, each with a time to act by. The column on the right is yours, to sign off each job as it is done.

Page 4 of 8
Your routine checks
A scheme of control written for your building: which outlet to flush each week, which temperatures to take each month, and what needs servicing each year. This is the list your logbook is kept against.

Page 5 of 8
Every heater, vessel and valve
Each item of plant has its own table: its condition, its pipework and the temperatures measured on the day. In the example the hot water cylinder is at 57.2°C, below the 60°C it should store water at, and that becomes the first finding.

Page 6 of 8
Every outlet, with its temperature
Each sink, washbasin, toilet and outside tap is listed with its own number, how often it is used and the temperatures measured. The same numbers are used in the photographs, the findings and the drawing.

Page 7 of 8
A drawing of your water system
Where the mains comes in, how the hot water is made and where every outlet is fed from, floor by floor. Dead legs and the outlets used for monthly temperature checks are marked.

Page 8 of 8
Who stands behind it
Reports are produced by Envirisk Ltd, which is registered with the Legionella Control Association (number 2024/3971). The certificate is in every report.
What every report covers
Written for your building and checked by the QC management team before it reaches you.
- Conditions of water systems on site
- Level of risk associated with water systems
- List of recommendations detailing remedial actions required to attain compliance with the current legislation
- Validity of legionella control scheme and records
- An up to date water asset register
- Schematic drawings of water systems
- Water temperature profiling of site
- Details of management personnel
- Schedule of legionella control tasks
Example report: common questions
Is this a real legionella risk assessment report?
It is the real report layout with a made-up building. The building, the people and the findings are invented. The sections, the tables and the level of detail are what you receive. The photographs are from real surveys of other buildings.
What is in a legionella risk assessment report?
Your level of risk, a list of what to fix in order of priority, a scheme of routine checks, a register of everything on the water system, a schematic drawing, the temperatures measured on the day and the people responsible.
How long is a real report?
It depends on the building. This example, for a small office with one hot water cylinder and 21 items on its water system, runs to 46 pages. Bigger buildings have more to inspect, so their reports are longer.
Can I use the example as my own risk assessment?
No. A risk assessment has to be of your own building's water system, by someone competent to assess it. The example shows what a report looks like. It says nothing about your building.
How much does a legionella risk assessment cost?
A legionella risk assessment starts from £200 + VAT. The price depends on the size and type of your building and how many sites you have. Tell us about your building and the office sends you a free, fixed quote. Water sample tests are priced per sample.